Skip to content
Install Manager

 Installer Piece Pay – Reference Sheet

Keating Kuhn

Keating Kuhn

August 11, 2026

 Installer Piece Pay – Reference Sheet

FULL SYSTEM INSTALLS – FLAT RATES

Flat rate is not affected by discounts. Rate does not change regardless of invoice total.

Line ItemFlat RateExpected Manhours
Split System – Closet / Upflow$1,00020
Split System – Attic / Horizontal$1,10022
Wall-mount AH + Condenser$85016–18
Fur-Down + Condenser$80014–16
Package unit5%8–12

Includes: Stand-Alone System Replacement Items on the Invoice

STANDALONE SYSTEM ACCESSORIES – 8%

Applies only when item appears separately from a full system install flat rate.

Includes but is not limited to: line-set replacement, flue pipe replacement, return cavity insulation, condensate drain line replacement, P-trap installation, secondary drain pan, standalone float switch.

BOXES – FLAT RATES

Line ItemFlat RateLeadHelper
Evap coil – Upflow$2754.0 hrs / $275
Evap coil – Upflow (2-person)$4255.5 hrs / $2973.0 hrs / $128
Evap coil – Attic$4255.5 hrs / $3292.0 hrs / $96
Condenser Replace$3503.5 hrs / $2611.5 hrs / $89
Compressor – Resi.$2504.0 hrs / $250
Compressor – Comm.$4004.0 hrs / $2872.0 hrs / $113
Air handler – Closet$4005.0 hrs / $3032.0 hrs / $97
Air handler – Attic$4756.0 hrs / $3742.0 hrs / $101
Furnace – Closet$4756.0 hrs / $3742.0 hrs / $101
Furnace – Attic$4005.0 hrs / $3032.0 hrs / $97
TXV Replacement$1253.0 hrs / $125

PERCENTAGE PAY RATES

ScopeRateNotes
Mini-Splits – All Types9%New install or replacement, single or multi-head
Dehu – New install9%New duct connections, drain line, electrical required
ERV – New install9%New duct connections, drain line, electrical required
Dehu – Attic or Swap$250 flatExisting connections or all thread/unistrut mount
ERV – swap existing$250 flatExisting connections in place
HVAC Accessories8%Not already included in system flat rate
Duct Cleaning13%Bucket sealing included in this percentage
Mold, Cleaning & Misc.10%Removal/reinstall, system cleaning, platform rebuild
Removal15%Insulation, metal duct, ductboard, sheetrock

DUCTWORK RATES

Combine ALL ductwork line items on the invoice first. Apply one rate to the combined total.

TierSummer (May 1 – Oct 31)Winter (Nov 1 – Apr 30)
Under $5,00012%11%
$5,000 – $9,99911%10%
$10,000 – $19,99910%9%
$20,000 and above9%8%

Items that count toward ductwork total: supply and return duct, sheet metal plenums, ductboard plenums, zone plenums and dampers, duct strapping, buckets/grilles/diffusers, wyes/elbows/transitions, duct sealing, system and duct balancing.

CREW SPLITS

One split applies to the entire job payout – not by line item. Use the split that reflects the maximum crew size on any part of the job.

2-PersonSplit3-PersonSplit4-PersonSplit
Lead + Jr Helper70/30Lead + 2 Helpers44/28/281 Lead + 3 Helpers35/22/22/22
Lead + Helper60/40Lead + Lead + Helper36/36/282 Leads + 2 Helpers30/30/20/20
Lead + Lead50/50All Leads33/33/33All Leads25/25/25/25

WARRANTY

Billable warranty and non-warranty boxes pay the same flat rate. Before piece pay releases:

  • Part returned to GES warehouse with warranty sheet attached
  • If taken directly to supply house – photo of warranty receipt uploaded to Workiz
  • Job closed in Workiz with warranty documentation noted

Non-billable GES warranty (GES-installed systems) – always hourly. Management must be notified before call is run.

CALLBACKS & ERRORS

Direct costs to GES from installer error within 30 days – incorrect materials, rework, damage – will be deducted from accumulated piece pay. All deductions documented in writing and acknowledged before applied.

PASS-THROUGH ITEMS

Crane, drywall subcontractor, or any third-party work – excluded from piece pay calculations.

GENERAL RULES – QUICK REFERENCE

  • Piece pay calculated on final collected amount after discounts – not pre-discount pricing
  • Flat rate system installs unaffected by discounts
  • All ductwork items combined before tier applied – one rate on full ductwork total
  • Mixed scope jobs calculated by category – each scope at its applicable rate, total is the sum
  • Job must be closed in Workiz with photos, notes, and payment confirmed before piece pay processes
  • Pass-through items excluded from all calculations
  • When in doubt on categorization – flag before processing